
- Home
- Roofing
Roofing Contractor · Lancaster, CA One roof. One crew. One warranty.
New roof, repair or solar-ready re-roof — our own roofing crew does the work, so your roof and your solar are covered by the same company.
Built for high-desert sun, wind and heat.
Antelope Valley roofs take a beating. We build them to last — and to carry solar for 25+ years.
Roof replacement
Full tear-off and re-roof in composite shingle, concrete or clay tile, with new underlayment and flashing.
Solar-ready re-roofing
Replace an aging roof right before solar goes on, so you never pay to remove panels later.
Roof repair & leaks
Leak tracing, cracked or slipped tiles, damaged flashing, vents and wind damage.
Tile reset & underlayment
Lift and re-lay existing tile over fresh underlayment — a new roof for less.
Flat & cool roofs
Low-slope roofing and reflective cool-roof systems that cut attic heat and AC load.
Solar remove & reinstall
Already have solar? We safely remove, re-roof and reinstall your panels in one project.


No finger-pointing between your roofer and your solar company.
When two companies touch your roof, a leak becomes an argument. With Intense Solar, it's one team and one phone number.
- Roof inspection with every solar designWe tell you honestly if your roof should be replaced before panels go on.
- Bundle and saveDoing roof and solar together saves a second mobilization and future panel removal.
- Cash, financing or leaseRoofing can be paid in cash or financed — often together with your solar.
Straight answers. No sales script.
Still unsure? Talk to the people who actually design and install your system.
Should I replace my roof before going solar?
If your roof has less than about 10 years of life left, yes. Panels last 25+ years, and removing and reinstalling them later costs thousands. We inspect every roof during the solar design and tell you honestly whether it needs work first.
Do you do roofing without solar?
Yes. Our roofing crew handles roof replacements, repairs, tile resets and flat roofs whether or not you add solar.
How long does a roof replacement take?
Most single-family homes take 2–4 days, depending on size, roof type and weather. Tile resets and solar remove-and-reinstall projects are scheduled so your home is never left exposed.
Will panels damage my roof or void the warranty?
We mount with flashed, sealed attachments rated for tile, shingle and flat roofs, and back every penetration with our own workmanship warranty. If your roof is near the end of its life, our own roofing crew can replace it before the solar goes on — one contractor, one warranty.
How do I pay — cash, loan or lease?
All three. Pay cash for the biggest lifetime return, finance with $0 down and own the system, or lease / PPA for a fixed monthly rate with maintenance included. We show all three side by side in your proposal.

Need a new roof before solar?
Get one inspection, one proposal and one crew for both — with cash, finance and lease options.